Finished Projects
Technical Management and supervision during construction of heavy lift and pipe layer vessel in China.
The project involved management and technical supervision on construction by expert inspectors organised within an integrated team in various disciplines in yard of construction ...
Supervision during construction of crane barge 2000 tones in China
The barge is non-propelled; the maximum 2000 T revolving crane has been installed on aft side of the barge with capability of slewing, luffing & hoisting movement at the same ...
Supervision during construction of seven units drilling land rigs in China
Akam Adak started supervision on 7 Land Rigs fabrication in Honghua Group (HH) yard. HH yard has located at Guanghan City in Sichuan Province and is the second largest Rig manufacture ...
Management and supervision on conversion of 1600 tones shear leg floating crane to 1600 tones salvage barge
The barge is non-propelled; shear leg floating crane barge, with 2 main hooks, each hook with 800T capability has been installed on the barge. Barge is used in construction and ...